刍议钻孔灌注桩施工关键技术与质量管理
文章作者:赵海欧 期刊页码:2022年第31期100页
浏览次数:392次
【摘要】钻孔灌注桩施工技术,施工流程较为简单,施工方便,对施工技术以及施工人员要求较低,并且能够在恶劣的施 工环境下进行,具有较强的可操作性。但在应用钻孔灌注桩施工技术时,由于施工环境较为复杂,对钻孔灌注桩的施工质 量难以进行直观的观测。因此,需要工作人员从整体出发,积极开展质量管理工作,并深入了解钻孔灌注桩技术的工作要 点,更好地提高工程的建设质量,实现预期的建设目标。
【关键词】钻孔灌注桩;施工技术;质量管理 iscussion on key technology and quality management of bored pile construction
【Abstract】Bored cast-in-place pile construction technology,with simple construction process,convenient construction,low requirements for construction technology and construction personnel,and can be carried out in harsh construction environment,has strong operability.However,in the application of bored pile construction technology,due to the complex construction environment,it is difficult to observe the construction quality of bored pile intuitively.Therefore,it is necessary for the staff to actively carry out quality management from the overall perspective and deeply understand the key points of bored pile technology,so as to better improve the construction quality of the project and achieve the expected construction goals.
【Key words】bored pile;Construction technology;Quality Assurance
【DOI】10.12334/j.issn.1002-8536.2022.31.024
-
Copyright 《中国房地产业》杂志社有限公司
地址:北京市东城区珠市口东大街天鼎218文化金融园区A11 邮编:100081
投稿邮箱:fdcy@vip.126.com 投稿电话:010-53655399